🏭
SAP PP 100 Days Challenge
Day 4 — Bill of Material (BOM)
1Views
0Downloads
0Likes
0Comments
0Shares
Interview Question
What is a Bill of Material (BOM)? Explain its purpose.
Answer
1. BOM stands for Bill of Material.
2. It is a list of all components required to manufacture a product.
3. It defines the quantity of each component.
4. BOM is used during MRP execution.
5. It helps calculate raw material requirements.
6. It is linked with the Production Order.
7. BOM reduces manual errors in production planning.
8. It ensures the correct materials are used during manufacturing.
Real-Time Example
A company manufactures bicycles.
1. Finished Product: Bicycle.
2. Frame – 1 Piece.
3. Wheel – 2 Pieces.
4. Handle – 1 Piece.
5. Seat – 1 Piece.
6. Chain – 1 Piece.
7. MRP checks the availability of all components.
8. Production starts only after all materials are available.
Practice Questions
1. What is a BOM?
2. Why is BOM required in SAP PP?
3. Can one product have multiple BOMs?
Related Jobs — SAP PP
I
SAP PPQM Lead
Incresol Software Services
HYDERABADOnsiteSAP PP and QM modules
I
SAP PPQM Freshers
Incresol Software Services
HYDERABADHybridSAP PP/QM
N
SAP PP QM Lead
NTT DATA Services
Hyderabad OnsiteSAP PP and SAP QM
S
Consultant, SAP PP/DS
Syntax
Hyderabad, TG, IN.OnsiteSAP PP and SAP PP/DS in S/4HANA environments
A
Custom Software Engineer
ACCENTURE
Hyderabad OnsiteSAP PP Production Planning & Control Discrete Industries
Discussion
to join the discussion.
Be the first to comment.