🏭
SAP PP 100 Days Challenge
Day 4 — Bill of Material (BOM)
15Views
0Downloads
0Likes
0Comments
0Shares
Interview Question
What is a Bill of Material (BOM)? Explain its purpose.
Answer
1. BOM stands for Bill of Material.
2. It is a list of all components required to manufacture a product.
3. It defines the quantity of each component.
4. BOM is used during MRP execution.
5. It helps calculate raw material requirements.
6. It is linked with the Production Order.
7. BOM reduces manual errors in production planning.
8. It ensures the correct materials are used during manufacturing.
Real-Time Example
A company manufactures bicycles.
1. Finished Product: Bicycle.
2. Frame – 1 Piece.
3. Wheel – 2 Pieces.
4. Handle – 1 Piece.
5. Seat – 1 Piece.
6. Chain – 1 Piece.
7. MRP checks the availability of all components.
8. Production starts only after all materials are available.
Practice Questions
1. What is a BOM?
2. Why is BOM required in SAP PP?
3. Can one product have multiple BOMs?
Related Jobs — SAP PP
S
SAP PP/QM/PM Consultant
Squirrels of Tech
Ahmedabad, GujaratHybridSAP PP, SAP QM, SAP PM
M
SAP PP Consultant
MyERPNetwork
IndiaHybridSAP PP
E
SAP PP Consultant
EDCS
BangaloreHybridSAP PP
A
SAP PP Fresher
Automatic Infotech
Bibwewadi, Pune, MaharashtraHybridSAP PP
I
SAP PP/QM Consultant
Ingenx Technology Pvt Ltd
Gurgaon, Haryana, IndiaHybridSAP PP/QM
Discussion
to join the discussion.
Be the first to comment.